Northwest Demolition was contracted for the selective removal of a 140’ stack and associated boiler structure at a Montana power plant. A high-reach excavator was utilized to remove the taller structures and a large pipe rack. Northwest Demolition also prepared the remaining top-hung boiler for implosion. The remote nature of the project site required additional logistics coordination.